View of the new Emergency Operations Center room.
View of one of the 11 monitoring banks in the new Emergency Communications Center room.
A breakroom was built per plan for 24hr personel coverage.
A new 3 floor elevator was needed to reach office areas.
View of the new hallways and office areas.
New bridgework required to transverse new heat lines.
New data control monitoring systems installed.
A new electrical room had to be built to house the new high voltage units.
Due to new sensitive electrical systems the fire protection system was upgraded to Inergen system.
New lockers and room created for personel.
View of new communications center meeting room.
Restrooms install for office areas.
New rubberized fiber insulated roof installed.
New storefront installed with new ceramic tile entrance.
New HVAC system and turbo fans installed.